Your approval
A protected transition that requires your decision bound to one exact document or version. The remaining domain is production deployment. The crew locks the plan and visual direction.
Document
A versioned object the pipeline leaves behind: research pack, strategy contract, copy freeze, design handoff, source, screenshot, quality-check report, deploy manifest, or review verdict.
Copy freeze
The locked visible contract for a page: headings, FAQ, schema, CTA, and internal links. Design and code are judged against this freeze, not against a new improvisation.
Product plan
The merged product plan. It is the last cheap stop before build. Approving it starts generation; it does not publish the site.
Your own AI account
Every model and data call runs on an account you connected and verified, and that provider bills you directly. Shipsite has no models of its own and takes no percentage of your usage.
Dijiang
The site coordinator assistant. It reads state and can dispatch governed work. It cannot approve on your behalf.
Preview vs production
Preview is a labeled, not-live build used for review and quality checks. Production is a gated promotion of one approved version to a live URL, with a receipt and a rollback pointer.